Hydropower Projects

Expertise in designing and constructing hydroelectric power plants that deliver reliable clean energy.

whatsapp image 2026 01 05 at 11.55.56 am

Jogmai Khola Small Hydroelectric Project – 7.6 MW

Location: Ilam District, Nepal
Capacity: 7.6 MW
Completion Year:2017
Highlights:

  • Delivered as the main contractor
  • Underground tunnel excavation and portal stabilization
  • Preliminary and final tunnel support works
  • Surface rock drilling and blasting operations
  • Completed safely within the project schedule

Kabeli B-1 Hydroelectric Project – 25 MW

Location: Panchthar, Nepal
Capacity: 25 MW
Completion Year: 2018
Highlights:

  • Package II (A): Construction of desanding basin and headpond in challenging hydropower terrain
  • Package IV (C): Construction of tailrace canal with precise excavation and hydraulic channel works
  • Delivered as the main contractor
  • High-quality structural concrete and hydraulic works
  • Completed within project schedule and technical specifications
whatsapp image 2025 12 07 at 12.11.09 f5440c1e

Iwakhola Hydroelectric Project – 9.9 MW

Location: Taplejung District, Nepal
Capacity: 9.9 MW
Completion Year: 2019
Highlights:

  • Executed as the main contractor
  • Construction of complete headworks system
  • Includes diversion weir, undersluice, intake, and flood protection wall
  • Gravel trap, approach canal, settling basin, and headpond development
  • High-precision civil works meeting hydropower standards

Khorunga Khola Small Hydropower Project – 4.8 MW

Location: Terhathum District, Nepal
Capacity: 4.8 MW
Completion Year: 2019
Highlights:

  • Delivered as the main contractor
  • Full civil construction works
  • Execution of headworks, waterways, and structural civil components
  • Completed with high-quality workmanship and project precision
  • Successfully finished within project timeline
image
image

Kabeli B1 Cascade Hydroelectric Project – 9.92 MW

Location: Panchthar District, Nepal
Capacity: 9.92 MW
Completion Year:2024
Highlights:

  • Delivered as the main contractor
  • Interconnection with upstream project for seamless water flow management
  • Construction of box culvert, spillway, forebay, headrace pipe, and surge tank
  • Powerhouse and tailrace civil works completed
  • Delivered with high-quality engineering and adherence to project timeline

Jogmai Cascade Hydroelectric Project – 5.2 MW (Lot 2: Main Civil Works)

Location: Ilam District, Nepal
Capacity: 5.2 MW
Completion Year: 2025
Highlights:

  • Main civil works for the Jogmai Cascade Hydropower Project
  • Includes all structural and hydraulic works for headworks, waterways, and powerhouse
  • Delivered as the main contractor
  • High-quality construction with adherence to safety and project schedule
image
whatsapp image 2026 01 04 at 11.48.37 am

Kabeli ‘A’ Hydroelectric Project – 37.6 MW

Location: Panchthar District, Nepal
Capacity: 37.6 MW
Completion Year: (Expected in 2026)
Highlights:

  • Main civil works including Construction of penstock alignment, Headrace Tunnel, powerhouse, tailrace, protection structures, and switchyard
  • Executed as the main contractor
  • High-quality structural and hydraulic works with adherence to safety standards