Jogmai Khola Small Hydroelectric Project – 7.6 MW
Location: Ilam District, Nepal
Capacity: 7.6 MW
Completion Year:2017
Highlights:
- Delivered as the main contractor
- Underground tunnel excavation and portal stabilization
- Preliminary and final tunnel support works
- Surface rock drilling and blasting operations
- Completed safely within the project schedule
Kabeli B-1 Hydroelectric Project – 25 MW
Location: Panchthar, Nepal
Capacity: 25 MW
Completion Year: 2018
Highlights:
- Package II (A): Construction of desanding basin and headpond in challenging hydropower terrain
- Package IV (C): Construction of tailrace canal with precise excavation and hydraulic channel works
- Delivered as the main contractor
- High-quality structural concrete and hydraulic works
- Completed within project schedule and technical specifications


Iwakhola Hydroelectric Project – 9.9 MW
Location: Taplejung District, Nepal
Capacity: 9.9 MW
Completion Year: 2019
Highlights:
- Executed as the main contractor
- Construction of complete headworks system
- Includes diversion weir, undersluice, intake, and flood protection wall
- Gravel trap, approach canal, settling basin, and headpond development
- High-precision civil works meeting hydropower standards
Khorunga Khola Small Hydropower Project – 4.8 MW
Location: Terhathum District, Nepal
Capacity: 4.8 MW
Completion Year: 2019
Highlights:
- Delivered as the main contractor
- Full civil construction works
- Execution of headworks, waterways, and structural civil components
- Completed with high-quality workmanship and project precision
- Successfully finished within project timeline


Kabeli B1 Cascade Hydroelectric Project – 9.92 MW
Location: Panchthar District, Nepal
Capacity: 9.92 MW
Completion Year:2024
Highlights:
- Delivered as the main contractor
- Interconnection with upstream project for seamless water flow management
- Construction of box culvert, spillway, forebay, headrace pipe, and surge tank
- Powerhouse and tailrace civil works completed
- Delivered with high-quality engineering and adherence to project timeline
Jogmai Cascade Hydroelectric Project – 5.2 MW (Lot 2: Main Civil Works)
Location: Ilam District, Nepal
Capacity: 5.2 MW
Completion Year: 2025
Highlights:
- Main civil works for the Jogmai Cascade Hydropower Project
- Includes all structural and hydraulic works for headworks, waterways, and powerhouse
- Delivered as the main contractor
- High-quality construction with adherence to safety and project schedule


Kabeli ‘A’ Hydroelectric Project – 37.6 MW
Location: Panchthar District, Nepal
Capacity: 37.6 MW
Completion Year: (Expected in 2026)
Highlights:
- Main civil works including Construction of penstock alignment, Headrace Tunnel, powerhouse, tailrace, protection structures, and switchyard
- Executed as the main contractor
- High-quality structural and hydraulic works with adherence to safety standards