Kulekhani III Jal Vidyut Project – 14 MW
Location: Nepal
Capacity: 14 MW
Completion Year: 1998
Client: Nepal Electricity Authority
Highlights:
- Construction of test audit tunnel
- Executed as labour contractor
- Completed with precision and adherence to project requirements
Chilime Hydroelectric Project – Package 2.3
Location: Nepal
Completion Year: 2003
Client: Larsen & Toubro Limited (Tunnel Works)
Highlights:
- Excavation for underground powerhouse and tunnel
- Executed as subcontractor
- Completed with high-quality civil engineering standards


Allain Duhangan Hydroelectric Project – 192 MW
Location: Manali, Himachal Pradesh, India
Capacity: 192 MW
Completion Year: 2009
Client: Larsen & Toubro Limited (Tunnel Works)
Highlights:
- Tunnel excavation and portal construction works
- Executed as labour contractor
- Completed with high-quality workmanship and adherence to project requirements
Tapovan Vishnugad Hydropower Project – 420 MW
Location: Uttarakhand, India
Capacity: 420 MW
Completion Year: 2010
Client: L&TAM-Tapovan
Highlights:
- Construction of tunnel works including TBM and adit portals
- Executed as labour contractor
- Completed with high-quality workmanship and adherence to project standards


Kabeli ‘A’ Hydroelectric Project – 37.6 MW
Location: Panchthar District, Nepal
Capacity: 37.6 MW
Completion Year: 2026
Client: Kabeli Energy Limited
Highlights:
- Main civil works including Construction of penstock alignment, powerhouse, tailrace, protection structures, and switchyard
- Executed as main contractor
- High-quality structural and hydraulic works
Jagdulla PRoR Hydroelectric Project -106 MW (Construction of Test Adit Tunnels
Location: Dolpa, Nepal
Capacity: 106 MW
Completion Year: 2021
Client: Jagdulla Hydropower Company Limited
Highlights:
- Construction of Test Adit Tunnels
- Executed as Main contractor
- Completed with high-quality workmanship and adherence to project standards