Tunnel Works

Tunnel Works

Engineering efficient, secure tunnels designed for long-term performance.

image

Kulekhani III Jal Vidyut Project – 14 MW

Location: Nepal
Capacity: 14 MW
Completion Year: 1998
Client: Nepal Electricity Authority
Highlights:

  • Construction of test audit tunnel
  • Executed as labour contractor
  • Completed with precision and adherence to project requirements


Chilime Hydroelectric Project – Package 2.3

Location: Nepal
Completion Year: 2003
Client: Larsen & Toubro Limited (Tunnel Works)
Highlights:

  • Excavation for underground powerhouse and tunnel
  • Executed as subcontractor
  • Completed with high-quality civil engineering standards
image
image

Allain Duhangan Hydroelectric Project – 192 MW

Location: Manali, Himachal Pradesh, India
Capacity: 192 MW
Completion Year: 2009
Client: Larsen & Toubro Limited (Tunnel Works)
Highlights:

  • Tunnel excavation and portal construction works
  • Executed as labour contractor
  • Completed with high-quality workmanship and adherence to project requirements


Tapovan Vishnugad Hydropower Project – 420 MW

Location: Uttarakhand, India
Capacity: 420 MW
Completion Year: 2010
Client: L&TAM-Tapovan
Highlights:

  • Construction of tunnel works including TBM and adit portals
  • Executed as labour contractor
  • Completed with high-quality workmanship and adherence to project standards
image
image

Kabeli ‘A’ Hydroelectric Project – 37.6 MW

Location: Panchthar District, Nepal
Capacity: 37.6 MW
Completion Year: 2026
Client: Kabeli Energy Limited
Highlights:

  • Main civil works including Construction of penstock alignment, powerhouse, tailrace, protection structures, and switchyard
  • Executed as main contractor
  • High-quality structural and hydraulic works


Jagdulla PRoR Hydroelectric Project -106 MW
(Construction of Test Adit Tunnels

Location: Dolpa, Nepal
Capacity: 106 MW
Completion Year: 2021
Client: Jagdulla Hydropower Company Limited
Highlights:

  • Construction of Test Adit Tunnels
  • Executed as Main contractor
  • Completed with high-quality workmanship and adherence to project standards