Buildings and Infrastructure

Creating strong, reliable infrastructure built to serve people, organizations, and essential operations.

image

Frame Structure Police Barrack Building – Rasuwa

Location: Rasuwa District, Nepal
Completion Year: 2021
Client: District Police Office, Ministry of Home Affairs, Government of Nepal

Highlights:

  • Construction of frame structure barrack building for the border police post
  • Delivered as the main contractor
  • High-quality structural works with adherence to government standards
  • Completed within the project timeline

Repair, Maintenance and Finishing Works of Office Building with Boundary Works-Rasuwagadhi Hydroelectric Project –

Location: Ghatte Khola, Gosainkunda-2, Timure, Rasuwa
Completion Year: 2021
Client: Rasuwagadhi Hydropower Company Limited

Highlights:

  • Repair, Maintenance and Finishing Works of Office Building with Boundary Works
  • Delivered as the JV Contractor – Tulsi Bhakta Sherpa Hydro JV
  • High-quality construction adhering to safety standards and project schedule
image

Prefab Buildings – Mudkechula Rural Municipality

Location: Mudkechula, Nepal
Completion Year: 2021
Client: Jagdulla Hydropower Company Ltd.
Highlights:

  • Construction of prefab buildings at Mudkechula Rural Municipality-04
  • Delivered as the main contractor
  • High-quality structural works with efficient construction techniques
  • Completed within the designated project timeline
image
image

Army Camp – Kabeli ‘A’ Hydroelectric Project – 37.6 MW

Location: Panchthar District, Nepal
Associated Project: Kabeli ‘A’ Hydroelectric Project
Client: Kabeli Energy Limited

Highlights:

  • Construction of an army camp to support project security and operations
  • Delivered as the main contractor
  • High-quality structural works adhering to safety and operational standards
  • Completed within the project schedule

Construction Works for infrastructure development-Likhu Khola Hydroelectric Project – 30 MW

Location: Okhaldhunga, Nepal
Capacity: 30 MW
Completion Year: 2024
Client: Pike Hydropower Limited

Highlights:

  • Construction works for infrastructure development supporting the hydropower project
  • Includes civil works for project facilities, access roads, and utilities
  • Delivered as the main contractor
  • High-quality construction adhering to safety standards and project schedule
image
image

Construction of camp facilities at the headworks site-Jagdulla PRoR Hydroelectric Project (Capacity-106 MW)

Location: Kaigaun, Dolpa, Nepal
Capacity: 106 MW
Completion Year: 2026
Client: Jagdulla Hydropower Company Ltd.

Highlights:

  • Construction of camp facilities at the headworks site to support project operations
  • Executed as the main contractor
  • High-quality structural works with adherence to safety and project standards
  • Ongoing project with targeted completion in 2026